20190915_173626

Construction works on the river calmed down!

Finally we discovered the fault of having a white water from time to time in the section of the Sava Bohinjka called “The Institute” it was this bug of some 10T weight who walked a bit in and out of the river haha… now the path to the pillars of the bridge Log is established, the mean machine will not need to touch the water any more. Clear river is the result and as long as the boys don`t finish their work (at least a month) we fly fisherman in the Sava Bohinjka are safe from the milky water!